Skip to content

History and dated evidence

These records preserve plans, measurements and validation at named revisions. They aren't current setup instructions, an active backlog or blanket hardware acceptance. Start with current documentation and qualification gaps.

Only this index is published to the documentation site. The linked source records stay outside ordinary site search. Local build/artifacts/ evidence is ignored and won't exist in a fresh clone.

Acceptance records

Record the tested revision and distinguish software checks, signing, installation and physical acceptance. Old sizes and test counts don't describe a later build.

Archived reviews and designs

Completed local-control and throughput plans were consolidated into the acceptance records above. Current behaviour belongs in the corresponding reference guide; new work should start from source and current status.